Alpha Construction Engineering Solutions Issue a brief
S-02 Capabilities schedule

A complete
temporary works service

We cover the full temporary works scope a principal contractor needs on a major project — design, certification and independent verification — across eight disciplines, to Australian and British codes.

C-01

Scaffold engineering

Heavy-duty, special-duty and engineered scaffold for height, span and loading beyond standard configurations. Design and certification.

AS/NZS 1576AS/NZS 4576
C-02

Formwork & falsework

Vertical and horizontal formwork, jump form and climbing systems, transfer-slab back-propping, slipform support.

AS 3610.2BS EN 12812
C-03

Propping & re-shoring

Back-prop schedules for early-strike formwork, slab re-shoring on transfer floors, propping for post-tensioned construction.

AS 3600AS 3610.2
C-04

Overhead protective structures

Heavy-duty and light-duty OPS, gantries and crash decks for works above public domain, live construction or operating infrastructure.

AS 1170AS 4100
C-05

Edge protection & access

Perimeter screens, work platforms, access decks, mast climber and material-hoist tie-in design.

AS/NZS 4994
C-06

Prefab transport & propping

Lift studies, rigging design, temporary support and bracing for prefabricated structural elements during transport, lift and final installation.

AS 1170AS 4100
C-07

Demolition engineering

Sequenced demolition methodology, temporary support of remaining structure, structural review and dilapidation reporting.

AS 2601
C-08

Independent design verification

Third-party design checks for principal contractor TWC requirements on Tier 1 and Tier 2 projects. Fast turnaround, clear sign-off.

S-02.1 Methodology

A process built for contractor programs

M-01 · Brief

Brief

Site walk, design intent review, program assessment. We understand the build before we put pencil to paper.

M-02 · Design

Design

Code-compliant calculations, drawing pack and detailing. Issued in formats that integrate with your document control.

M-03 · Certify

Certification

Sign-off by registered professional engineer. Independent verification available where principal contractor requires it.

M-04 · Support

Site support

RFI response, variations, attended inspections and as-built confirmation. We stay engaged through the program.

S-02.2What you get
D-01 / Deliverables

Drawing packs that drop into your document control

Every engagement is issued as a complete, revision-controlled drawing pack: general arrangements, details, member schedules and a design certificate signed by a registered professional engineer. Formats match your project's document management — no reformatting at your end.

D-02 / Turnaround

Built for the speed of a live site

Temporary works rarely arrive with a comfortable lead time. We're structured to turn around verification checks and design packages fast, and to answer RFIs while the crew is still on the deck — not three days later.

D-03 / Independence

An independent engineer of record

As an independent consultancy with no equipment to sell or hire, our advice is tied only to the engineering. For principal contractors that need a genuinely third-party design check to satisfy their Temporary Works Coordinator, that independence is the point.